Announcement
Starting on July 4, 2018 the Indonesian Publication Index (IPI) has been acquired by the Ministry of Research Technology and Higher Education (RISTEKDIKTI) called GARUDA Garba Rujukan Digital (http://garuda.ristekdikti.go.id)
For further information email to portalgaruda@gmail.com

Thank you
Logo IPI  
Journal > JURNAL KARYA TEKNIK SIPIL > PERENCANAAN PENGGANTIAN JEMBATAN TINJOMOYO KOTA SEMARANG

 

Full Text PDF (397 kb)
JURNAL KARYA TEKNIK SIPIL
Volume 2, Nomor 2, Tahun 2013
PERENCANAAN PENGGANTIAN JEMBATAN TINJOMOYO KOTA SEMARANG
Mulyaning Wahyu, Indra Hadi ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH. Tembalang, Semarang 50275)
Musadad, Kurmein Al ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH. Tembalang, Semarang 50275)
Narayudha, Moga ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH. Tembalang, Semarang 50275)
Adi, Rudi Yuniarto ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. Soedarto SH. Tembalang, Semarang 50275)
Article Info   ABSTRACT
Published date:
30 Apr 2013
 
The purpose of planning the replacement of  the bridge is the first Tinjomoyo to the facilitate public access Tinjomoyo an increasingly crowded, and then to replace the steel bridge that was damaged because there is no control of the government for the cost of care is expensive and prone to corrosions and there fore the government has an alternative to replace the bridge permanently by using concrete bridge or concrete because of soil condition in the area tinjomoyo including hard ground and there fore the selection of the palm of shallow foundation and wells as a load – bearing, but it is not concrete in terms of treatment need special care such as steel concrete bridge corrosions. Event not experience in bridge construction is needed time of 32 weeks.
Copyrights © 2013