Journal > JURNAL KARYA TEKNIK SIPIL > EVALUASI WASTE PADA PROYEK GEDUNG DI WILAYAH SEMARANG

 

Full Text PDF (660 kb)
JURNAL KARYA TEKNIK SIPIL
Volume 3, Nomor 4, Tahun 2014
EVALUASI WASTE PADA PROYEK GEDUNG DI WILAYAH SEMARANG
Hadiman, Hanintyo ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
Hatmoko, Jati Utomo Dwi ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
Kistiani, Frida ( Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275)
Article Info   ABSTRACT
Published date:
29 Jan 2015
 
Construction project have problems regarding waste, which can be in forms of Physical Construction Waste and Non-Value Adding Activity. The purpose of this research is to evaluate waste that occured in construction projects, while the aim of this research is to know the frequency and impact of waste, as well as the waste cause factor. The object of the research was waste on building project in the area of Semarang. Waste identification was carried outfrom literature, observation and interview and wereanalyzed using fishbone diagram to get waste cause factor variable. Waste variables were divided into four categories, i.e. waiting periods, material, human resources, and operations. Waste cause factor variables were grouped into six categories, i.e. people, professional management, design and documentation, materials, execution and external.Questionnaires were distributed to 100 respondents of 12 different contractors, with response rate of 65%. Data was processed by Weighted Mean Score (WMS) method. The results of this research showed that “extra work” waste had the highest frequency, “rework and repair” waste had the highest impact, and “slow drawing revision and distribution” and “design changes”, were the highest waste cause factors on building projects in the area of Semarang. The results of data processing also showed that structural works was type of work where waste often occurred. The result of risk-waste matrix showed that “extra work” was included into high risk-waste category which means it could cause serious disruptions to the project execution and company’s finance.