Announcement
Starting on July 4, 2018 the Indonesian Publication Index (IPI) has been acquired by the Ministry of Research Technology and Higher Education (RISTEKDIKTI) called GARUDA Garba Rujukan Digital (http://garuda.ristekdikti.go.id)
For further information email to portalgaruda@gmail.com

Thank you
Logo IPI  
Journal > Civil Engineering Dimension > ON REPRESENTING FACTORS INFLUENCING TIME PERFORMANCE OF SHOP-HOUSE CONSTRUCTIONS IN SURABAYA

 

Full Text PDF (179 kb)
Civil Engineering Dimension
Vol 5, No 1 (2003): MARCH 2003
ON REPRESENTING FACTORS INFLUENCING TIME PERFORMANCE OF SHOP-HOUSE CONSTRUCTIONS IN SURABAYA
Andi, Andi ( Postgraduate Program in Construction Management, Petra Christian University, Jalan Siwalankerto 121-131, Surabaya 60236, Indonesia)
Susandi, Susandi ( Alumni, Department of Civil and Planning Engineering - Petra Christian University)
Wijaya, Hendra ( Alumni, Department of Civil and Planning Engineering - Petra Christian University)
Article Info   ABSTRACT
Published date:
02 Jun 2004
 
Some shop-houses were built late and others are on time, or faster than the schedule that had been planned. The questions are how it could happen and what kind of factors that made it happened. This research has an objective to investigate time performance of shop-house constructions in Surabaya by representing factors that influence it. It first assembles potential influencing factors through literature review, and second, conducts an empirical study by collecting data from finished thirty-two shop-house projects throughout the city. Results of analyses using one-way analysis of variance (ANOVA) indicate eight factors to be statistically significant influencing time performance. They are construction design change, schedule of work that will be done, workers discipline, material availability, owner’s payment, quality control, workers availability, and material delivery. The paper discusses the factors and proposes possible solutions to improve time performance.
Copyrights © 2004